PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Laying out block at the 3rd floor Detention cells Facing West.jpg Sprinkler pipe material.jpg 3rd floor Interior metal framing Facing North-West.jpg Constructing parapet along the High Roof Facing South-West.jpg Constructing the parapet along the high roof Facing East.jpg Installed junction boxes at the cmu wall.jpg Installed roof drains at the low roof Facing North-East.jpg Installing ductwork at the 4th floor Facing West.jpg Installing electrical conduit above the ceiling at the 4th floor Facing South.jpg
Previous pageNext page Constructing the parapet along the high roof Facing East
Constructing the parapet along the high roof Facing East